docs: remove already-implemented sync reliability task from NEXT.md
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
This commit is contained in:
co-authored by
Claude Sonnet 4.6
parent
24ca243edc
commit
fb805201a9
@@ -7,19 +7,3 @@ Do one thing, then run `task check`. Then commit.
|
||||
After commit, remove the item from this document.
|
||||
|
||||
## Tasks
|
||||
|
||||
Create a script which tests that IMAP/JMAP to DB sync works reliably.
|
||||
|
||||
Create two DBs which connect to the same Stalwart account.
|
||||
|
||||
The script should do random create/update/deletes on both DBs (via the Dart code), and check after
|
||||
100 concurrent changes, that both DBs are in sync.
|
||||
|
||||
The script should be called with a the number of updates (100 by default) and the number of cycles
|
||||
(50 by default).
|
||||
|
||||
Then check the script. First with small amount: 10/1, 20/2, ...
|
||||
|
||||
BTW: Start an own Stalwart server for this. See existing code.
|
||||
|
||||
Ask questions first. Then do.
|
||||
|
||||
Reference in New Issue
Block a user